Ford Mustang (1999-2004) Service Manual: Timing Drive Components

Special Tool(s)

Holding Tool, Crankshaft 303-448 (T93P-6303-A)
Installation
All vehicles 1. Position the engine front cover gasket on the engine front cover. 2. NOTE: If the engine front cover is not secured within four minutes, the sealant must be removed and the sealing ...

Removal
CAUTION: Since the engine is not free-wheeling, if the crankshaft or the camshafts are moved in any manner during removal and installation, the crankshaft and the camshafts must be re-synchronized. ...

Other materials:

Air Conditioning (A/C) Pressure Relief Valve - 4.6L
Material Item Specification PAG Refrigerant Compressor Oil (R-134a Systems) F7AZ-19589-DA (Motorcraft YN- 12-C) WSH-M1C231- B Removal and Installation NOTE: Installation of a new suction accumulator is not required when repairing the ...

Exhaust Gas Recirculation (EGR) Vacuum Regulator Solenoid
Mach I vehicles 1. Remove the air intake scoop. For additional information, refer to Section . All vehicles 2. Remove the exhaust gas recirculation (EGR) vacuum regulator solenoid. Disconnect the electrical connector. Remove the bolts. 3. To ins ...

Torque Converter Cleaning And Inspection
Material Item Specification MERCON V Automatic Transmission Fluid XT-5-QM, XT-5-DM MERCON V 1. If a new torque converter is being installed, continue with Substep 2 of Step 2. 2. If a new torque converter is not being installed, the fol ...