Ford Mustang (1999-2004) Service Manual: Timing Drive Components
Special Tool(s)
|
|
Holding Tool, Crankshaft 303-448 (T93P-6303-A) |
Installation
All vehicles
1. Position the engine front cover gasket on the engine front cover.
2. NOTE: If the engine front cover is not secured within four minutes, the
sealant must be removed
and the sealing ...
Removal
CAUTION: Since the engine is not free-wheeling, if the crankshaft or
the camshafts are
moved in any manner during removal and installation, the crankshaft and the
camshafts must
be re-synchronized.
...
Other materials:
Electronic Engine Controls - Cobra
Most of the Cobra engine electronic controls are similar to that of
the non-supercharged 4.6L (2V)
engine. These components are as follows:
Crankshaft position (CKP) sensor
Throttle position (TP) sensor
Idle air control (IAC) valve
Mass air ...
Selector Lever
Removal
1. Remove the shifter top control panel.
2. Disconnect the electrical connectors.
3. Remove the shifter bezel.
4. Remove the bulb from the bezel.
5. Disconnect the TCS connector.
6. CAUTION: Extra force may be needed to lift up on the handl ...
Generator - 4.6L 4V
Removal and Installation
1. Disconnect the battery. For additional information, refer to
Section.
2. Relieve the accessory drive belt tension and remove the belt from the
generator pulley.
3. Raise and support the vehicle. For additional informat ...

