Ford Mustang (1999-2004) Service Manual: Upper Arm - Cobra
Installation
1. Install the upper arm and bushing to the mounting bracket.
1. Position the arm and bushing.
2. Install a new nut and bolt. Do not tighten at this time.
2. Connect the upper arm and bushing to ...
Removal
CAUTION: Suspension fasteners are critical parts because they affect
performance of vital
components and systems and their failure can result in major service expense. A
new part with
the same part ...
Other materials:
Installation
1. Apply silicone gasket and sealant in the locations shown.
2. Install the engine front cover.
3. Install the belt idler pulleys and the bolts.
4. Connect the CMP sensor electrical connector.
5. Raise the vehicle.
6. Install the crankshaft fr ...
Thermostat - 4.6L(4V)
Material
Item
Specification
Motorcraft Premium Gold
Engine Coolant
VC-7-A (in Oregon VC-7-B)
(yellow color)
WSS-M97B51-
A1
Removal and Installation
1. With the vehicle in neutral, position it on a hoist. For additional
information, ...
Installation
Lift cylinder
1. NOTE: Be sure that each fitting is installed in the correct position on
the folding top hydraulic
component.
NOTE: Make sure that the tetra seal is installed in the bottom of each of the
folding top
hydraulic cylinder ports before attaching ...
