Ford Mustang (1999-2004) Service Manual: Cylinder Head LH
Special Tool(s)
![]() |
Remover, Power Steering Pump Pulley 211-016 (T69L-10300-B) |
![]() |
Installer, Power Steering Pump Pulley 211-009 |
Material

Exhaust Manifold RH
Removal and Installation
1. Disconnect the battery negative cable. For additional information,
refer to Section.
2. Remove the air cleaner outlet pipe. For additional information, refer to
Sect ...
Removal
1. Disconnect the battery negative cable.
2. Drain the engine cooling system.
3. Remove the LH exhaust manifold. For additional information, refer to
Exhaust Manifold-LH in
this section.
4. ...
Other materials:
Stoplamps
Refer to Wiring Diagrams Cell 90 , Turn/Stop/Hazard Lamps for
schematic and connector information.
Special Tool(s)
73III Automotive Meter or
equivalent
105-R0057
Inspection and Verification
1. Verify the customer concerns.
2. Visually ...
Utilizing the mediation or arbitration program
(Canada only)
This pertains to vehicles delivered to authorized Canadian dealers.
In those cases, where you continue to feel that the efforts by Ford of
Canada and the authorized dealer to resolve a factory-related vehicle
service concern have been unsatisfactory, Ford of ...
Inspection and Verification
1. Verify the customer's concern by operating the climate control system
to duplicate the condition.
2. Inspect to determine if one of the following mechanical or electrical
concerns apply:
Visual Inspection Chart
Mechanical
Electrical
...


