Ford Mustang (1999-2004) Service Manual: Timing Drive Components
Special Tool(s)
|
|
Holding Tool, Crankshaft 303-448 (T93P-6303-A) |
Installation
All vehicles
1. Position the engine front cover gasket on the engine front cover.
2. NOTE: If the engine front cover is not secured within four minutes, the
sealant must be removed
and the sealing ...
Removal
CAUTION: Since the engine is not free-wheeling, if the crankshaft or
the camshafts are
moved in any manner during removal and installation, the crankshaft and the
camshafts must
be re-synchronized.
...
Other materials:
Camshaft
Removal and Installation
1. Remove the timing chains. For additional information, refer to Timing
Drive Components in this
section.
2. Remove the roller followers. For additional information, refer to Camshaft
Roller Follower in this
section.
3. Remove the ...
Runout Check - Brake Disc and Hub
Special Tool(s)
Brake Measurement Kit
134-R0199 or equivalent
Material
Item
Specification
High Temperature Nickel Anti-
Seize Lubricant
F6AZ-9L494-AA
ESE-M12A4-
A
CAUTION: The brake disc (1126) runout specification must ...
Inspection and Verification
1. Verify the customer concern is with the evaporative emission (EVAP)
system.
2. Visually inspect for the following obvious signs of mechanical damage.
Visual Inspection Chart
Mechanical
Fuel filler cap
EVAP test port
...

