Ford Mustang (1999-2004) Service Manual: Electronic Pressure Control (EPC) Solenoid
Special Tool(s)
![]() |
Gauge, Transmission Solenoid Connectors 307-426 |
Removal
1. Remove the manual control lever. For additional information, refer to Manual Control Lever Shaft and Seal in this section.
2. CAUTION: Do not pull on the molded lead frame. This may cause damage to the connector ends. Carefully pry up on the locking tabs to disconnect the solenoids.
Disconnect the molded lead frame from the solenoids.
Disconnect the molded lead frame from the solenoids.
1. Disconnect the shift solenoid SSA and SSB.
2. Disconnect the torque converter clutch (TCC).
3. Disconnect the electronic pressure control (EPC) solenoid.
4. Disconnect the bulkhead inter-connector.

3. Remove the EPC solenoid.
1. Remove the bolt and EPC solenoid bracket.
2. Remove the EPC solenoid.

Installation
1. Install the EPC solenoid.
1. Install the EPC solenoid.
2. Install the EPC solenoid bracket and bolt.

2. Inspect the lead frame for damage.
- Using the special tool, check all lead frame solenoid connections. The gauge should fit tightly and not fall out after being inserted.
- If the special tool passes through any lead frame connector pins or does not feel like it makes a good contact, install a new lead frame.

3. Connect the molded lead frame to the solenoids.
- Connect the bulkhead inter-connector by pressing it in place by hand and fully seating the connector in place.
- Connect the EPC solenoid by pressing it in place by hand and fully seating the connector in place. Make sure that the terminals pass fully through the connector slots.
- Connect the TCC by pressing it in place by hand and fully seating the connector in place. Make sure that the terminals pass fully through the connector slots.
- Connect the shift solenoid SSA and SSB by pressing it in place by hand and fully seating the connector in place. Make sure that the terminals pass fully through the connector slots.

4. Install the manual control lever. For additional information, refer to Manual Control Lever Shaft and Seal in this section.
Extension Housing Seal and Gasket
Special Tool(s)
Slide Hammer
100-001 (T50T-100-A)
Installer, Transmission
Extension Housing Fluid Seal
308-002 (T61L-7657-A)
Remover, Transmission Fluid
Seal ...
Manual Control Lever Shaft and Seal
Special Tool(s)
Installer, Shift Shaft Fluid Seal
307-050 (T74P-77498-A)
Alignment Gauge, TR Sensor
307-351 (T97L-70010-A)
Removal
1. Drain the transmission fluid and re ...
Other materials:
Key Programming - Enable/Disable Spare Key
Programming
Special Tool(s)
Worldwide Diagnostic System
(WDS)
418-F224,
New Generation STAR (NGS)
Tester
418-F052, or equivalent
diagnostic tool
NOTE: The spare key programming switch is a diagnostic tool programmable
switch that provides the
ca ...
Fuel Charging Wiring Harness
Removal and Installation
WARNING: Do not smoke or carry lighted tobacco or open flame of any
type when
working on or near any fuel related components. Highly flammable mixtures are
always present
and can ignite. Failure to follow these instructions can resul ...
Thermostat - 3.8L
Material
Item
Specification
Gasket Adhesive
TA-6 or equivalent
WSS-M2G408-
A
Motorcraft Premium Gold
Engine Coolant
VC-7-A (in Oregon VC-7-B)
(yellow color)
WSS-M97B51-
A1
Removal and Installation
1. Drain the engine cool ...

