Ford Mustang (1999-2004) Service Manual: Supercharger Belt Idler Pulley

Removal and Installation

1. Remove the supercharger drive belt cover.

Supercharger Belt Idler Pulley

2. Rotate the supercharger belt tensioner clockwise and remove the supercharger belt.

Supercharger Belt Idler Pulley

3. Remove the bolt and the supercharger belt idler pulley.

Supercharger Belt Idler Pulley

4. To install, reverse the removal procedure.

 

    Accessory Drive Belt Idler Pulley - 4.6L (2V) and (4V)
    Removal and Installation Mach I 1. Remove the air intake scoop. For additional information, refer to Section. Cobra 2. Remove the supercharger drive belt cover. 3. Rotate the supercharger belt tensi ...

    Starting System
    General Specifications Torque Specifications ...

    Other materials:

    Transmission (Removal)
    1. Remove the gearshift lever knob. 2. Remove the console panel gearshift plate. Disconnect the cigar lighter electrical connector, then lift the gearshift lever boot over the gearshift lever. 3. Remove the bolts and the upper gearshift lever. 4. Remove ...

    Camshaft Runout
    Special Tool(s) Dial Indicator Gauge with Holding Fixture 100-002 (TOOL-4201-C) or equivalent 1. NOTE: Camshaft journals must be within specifications before checking runout. Use a Dial Indicator Gauge with Holding Fixture to measure the ...

    Apply Components
    There are eight apply components used to drive or hold the planetary gearset components. Band-Overdrive   1. The overdrive band holds the reverse clutch drum stationary in fourth gear and manual 2. This action causes the reverse sun gear to be h ...