Ford Mustang (1999-2004) Service Manual: Supercharger Belt Idler Pulley

Removal and Installation

1. Remove the supercharger drive belt cover.

Supercharger Belt Idler Pulley

2. Rotate the supercharger belt tensioner clockwise and remove the supercharger belt.

Supercharger Belt Idler Pulley

3. Remove the bolt and the supercharger belt idler pulley.

Supercharger Belt Idler Pulley

4. To install, reverse the removal procedure.

 

    Accessory Drive Belt Idler Pulley - 4.6L (2V) and (4V)
    Removal and Installation Mach I 1. Remove the air intake scoop. For additional information, refer to Section. Cobra 2. Remove the supercharger drive belt cover. 3. Rotate the supercharger belt tensi ...

    Starting System
    General Specifications Torque Specifications ...

    Other materials:

    Relay Switch
    1. Disconnect the battery ground cable. For additional information, refer to Section. 2. Remove the power distribution box cover. 3. Remove the starter relay from the power distribution box. Installation 1. To install, reverse the removal procedure. ...

    Hinge Adjustment
    NOTE: The door should be adjusted for even and parallel fit with the body opening and surrounding panels as well as making sure that the anti-chuck pin is not binding on convertible models. 1. Remove the A-pillar lower trim panel. 2. Position the ...

    Fittings - Vapor Tube
    Disconnect 1. WARNING: The evaporative emission system contains fuel vapor and condensed fuel vapor. Although not present in large quantities, it still presents the danger of explosion or fire. Disconnect the battery ground cable from the battery to minimiz ...