Ford Mustang (1999-2004) Service Manual: Supercharger Belt Idler Pulley
Removal and Installation
1. Remove the supercharger drive belt cover.

2. Rotate the supercharger belt tensioner clockwise and remove the supercharger belt.

3. Remove the bolt and the supercharger belt idler pulley.

4. To install, reverse the removal procedure.
Accessory Drive Belt Idler Pulley - 4.6L (2V) and (4V)
Removal and Installation
Mach I
1. Remove the air intake scoop. For additional information, refer to Section.
Cobra
2. Remove the supercharger drive belt cover.
3. Rotate the supercharger belt tensi ...
Starting System
General Specifications
Torque Specifications
...
Other materials:
Thermostat - 4.6L(2V)
Material
Item
Specification
Motorcraft Premium Gold
Engine Coolant
VC-7-A (in Oregon VC-7-B)
(yellow color)
WSS-M97B51-
A1
Removal and Installation
1. Drain the engine coolant. For additional information, refer to Cooling
System Dra ...
Principles of Operation
Evaporative Emission (EVAP) Canister Purge Valve
The EVAP canister purge valve is controlled by the powertrain control
module (PCM). The EVAP
canister purge valve controls the flow of fuel vapors from the EVAP canister
to the engine intake
manifold duri ...
Control Valve
Removal
1. Disconnect the brake tubes.
2. Remove the brake fluid control valve bracket nut.
Installation
1. To install, reverse the removal procedure.
...
