Ford Mustang (1999-2004) Service Manual: Starting System

General Specifications

Torque Specifications

Supercharger Belt Idler Pulley
Removal and Installation 1. Remove the supercharger drive belt cover. 2. Rotate the supercharger belt tensioner clockwise and remove the supercharger belt. 3. Remove the bolt and the supercharger ...

Starting System (Description and Operation)
Starter Motor The starter motor is a 12-volt unit that has the starter solenoid mounted on the drive end housing and functions as follows: The current flows through the solenoid energizing coil unt ...

Other materials:

Cylinder Head LH
Special Tool(s) Remover, Power Steering Pump Pulley 211-016 (T69L-10300-B) Installer, Power Steering Pump Pulley 211-009 Material ...

Assembly
1. Lubricate the differential side gear thrust washers and the differential side gear journals, and assemble the washers to the gears. Use SAE 75W-140 High Performance Rear Axle Lubricant F1TZ-19580-B or equivalent meeting Ford specification WSL-M2C192-A ...

Valve Cover RH
Removal and Installation 1. Remove the throttle body. For additional information, refer to Section. 2. Disconnect the crankcase vent hose. 3. Remove the differential feedback exhaust gas recirculation (EGR) system vacuum hoses and the bracket bolts. Po ...