Ford Mustang (1999-2004) Service Manual: Starting System
General Specifications

Torque Specifications

- Starting System (Description and Operation)
- Starting System (Diagnosis and Testing)
- Starter Drive and Flywheel Ring Gear Inspection
- Relay Switch
- Starter Motor - 3.8L
- Starter Motor - 4.6L
Supercharger Belt Idler Pulley
Removal and Installation
1. Remove the supercharger drive belt cover.
2. Rotate the supercharger belt tensioner clockwise and remove the
supercharger belt.
3. Remove the bolt and the supercharger ...
Starting System (Description and Operation)
Starter Motor
The starter motor is a 12-volt unit that has the starter solenoid mounted on
the drive end housing and
functions as follows:
The current flows through the solenoid energizing coil unt ...
Other materials:
Oil Filter Adapter
Material
Item
Specification
Super Premium SAE 5W-20
Motor Oil
XO-5W20 QSP or equivalent
WSS-M2C153-
H
Premium Engine Coolant
VC-4A (In Canada CXC-10; In
Oregon VC-5) or equivalent
ESE-M97B44-
A
Removal and Installation
1. ...
Installation
1. NOTE: This procedure applies to both the LH and RH halfshafts.
Install a new driveshaft bearing retainer circlip.
2. Remove the special tool.
3. CAUTION: Differential seal damage will occur if installing the
halfshaft without the
special tool installed. ...
Rear Drive Axle/Differential - Ford 8.8-Inch Ring Gear
General Specifications
Torque Specifications
Description
Nm
lb-ft
lb-in
Bolt retaining the differential pinion shaft to the
differential case
30
22
-
Bolt retaining the driveshaft yoke to the pinion flange
112
83
-
...
